Metoc plc delivered the Sheringham Shoal Offshore Wind Farm cable landfall erosion study for StatoilHydro. The desk study assessed landfall and coastal erosion considerations relevant to maintaining safe cable burial at the Weybourne landfall over the project lifetime, referencing available survey charts and published data and setting design requirements for minimum overburden and thermal dissipation.