MT Højgård supplied the two offshore substation platform structures for the Sheringham Shoal Offshore Transmission Assets under a construction-phase contract let by StatoilHydro. The scope covered fabrication and delivery of the offshore substation structures that house the 132/33 kV electrical equipment, forming the core HVAC offshore substations for the grid connection of the Sheringham Shoal Offshore Wind Farm. This was a construction-phase role related specifically to the OFTO assets prior to their transfer to the licensed OFTO entity.