Master Marine ASA was contracted by StatoilHydro to install the two offshore substation platform structures for the Sheringham Shoal Offshore Transmission Assets. Its construction-phase scope comprised marine transport and heavy-lift installation of the fabricated offshore substation structures at the wind farm site off the North Norfolk coast. This work formed part of the build-out of the OFTO’s offshore HVAC substations ahead of asset transfer to the OFTO owner.