EPIC inner-array cables scope: engineering, procurement, installation and commissioning of 312km 66kV submarine composite cables; Seagreen Array Cables (MVAC 66 kV) total route length 300 km (database).
Seaway7 was awarded a contract by SSE Renewables in June 2020 to execute EPCI work for the Seagreen offshore wind farm, including the wind turbine generator foundations and the inner-array cable system. The inner-array package covered engineering, procurement, installation and commissioning of a 66 kV submarine cable system including accessories, protection systems, burial, termination, testing and pre-commissioning. The overall EPCI scope also included transportation and installation of the 114 suction caisson jacket foundations.