TWD engineers provided detailed engineering and delivered installation support equipment to assist Bilfinger with foundation installation at the Sandbank offshore wind farm. The scope included design of a monopile gripper tool, hydro sound damper (HSD) deployment frame, and an upending hinge, as well as seafastening structures for monopiles and various transition pieces, fabricated and delivered ready for operation within nine months.