Scottish and Southern Electricity Networks (SSEN), as the onshore transmission owner, was stated to be responsible for planning, consenting, consultation, construction and operation of the electricity grid connection between the Salamander project’s onshore substation and the National Grid. This scope relates specifically to delivering the grid connection works required to export power from the project into the national transmission system.