Réseau de Transport d’Électricité (RTE) acted as contracting authority and project manager for the Saint-Brieuc offshore wind farm grid connection. RTE delivered the onshore and offshore electrical connection works (including the 225 kV connection links) and expanded the existing La Doberie substation at Hénansal to enable power evacuation from the wind farm, and stated it would maintain the connection assets.