In 1988 a third converter station rated 50 MW, together with a reversible ground electrode, was installed at Lucciana in Corsica, converting the SACOI 1 HVDC link into a multi‑terminal scheme capable of importing or exporting power to the island while maintaining the main Sardinia–Italy power flow.