Array cabling installation at Robin Rigg (MVAC 33 kV array system; total route length 42.0 km). Source also references AC export cabling installation.
Subocean Group Limited was identified as the installer for cabling works at the Robin Rigg offshore wind farm, including installation of the array (infield/inter-turbine) cabling; the source also states the company installed the project’s AC export cabling.