Fred Olsen WindCarrier’s installation vessel Bold Tern was reported to have transported and installed the SWT-3.6-120 wind turbines at the Riffgat offshore wind farm, loading tower sections, nacelles and rotor blades in Esbjerg and commuting to the site until all 30 turbines were installed.