installation and burial of array cables / lay and bury 122 array cables
Fugro was contracted to install and bury array cables at the Rampion Offshore Wind Farm. Fugro’s scope covered installation and burial of 122 array cables, planned to be executed in two phases during 2016 and 2017, using the vessels Fugro Symphony and Fugro Saltire and a Q1400 trenching system for cable burial. Fugro later reported completing phase one by installing 60 cables and planned to return to install the remaining 62 cables in phase two.