ABB was awarded a turnkey contract to provide the onshore substation and power infrastructure for the offshore platform (offshore substation) for the Rampion Offshore Wind Project. The scope included delivery of the onshore substation, including high-voltage air-insulated switchgear, gas-insulated switchgear, transformers, substation automation, and control and protection systems. ABB’s scope also included medium-voltage switchgear, power transformers, and protection and control systems for the offshore platform, as well as two new switchgear bays with control and protection equipment for National Grid’s substation at Bolney.