Installation and trenching of 91 inter-array cables with a combined length of ~106 km, including route engineering and PLGR.
DeepOcean 1 UK Ltd was awarded a contract by DONG Energy to install and trench the Race Bank offshore wind farm’s inter-array cable system. The scope included installation and burial of 91 inter-array cables with a combined length of approximately 106 km, plus associated route engineering, pre-lay grapnel runs, and installation of cable protection system elements and messenger wires, executed in offshore campaigns during 2016/2017.