Negative
Setback or risk materialised
Medium Impact
Significant progress or notable issue
In early 2021, the operational 573 MW Race Bank offshore wind farm off the UK coast experienced an outage, during which a subsequent inspection campaign revealed a failure of an inter-array cable linked to problems with the cable protection system.