Positive
Project advancing - milestone achieved
High Impact
Major milestone or critical setback
The 573 MW Race Bank offshore wind farm, located around 27 km off the Norfolk coast and 28 km off Lincolnshire in the North Sea and equipped with 91 Siemens 6 MW turbines, entered full commercial operation in February 2018, becoming fully operational and supplying power to the UK grid via its connection at Walpole in Norfolk.