Iemants, part of the Smulders group, worked together with Engie Fabricom to deliver both offshore substations for the Race Bank offshore wind farm grid connection, which later became part of the Race Bank OFTO transmission assets. Iemants contributed to the construction-phase fabrication and assembly of the substation structures at Hoboken in Belgium prior to their transport offshore.