Positive
Project advancing - milestone achieved
Medium Impact
Significant progress or notable issue
By 30 September 2016, installation of the onshore export cables for the Race Bank OFTO was complete and all cables had been high-voltage tested. The two 220 kV onshore export cable systems, running approximately 11.6 km from the onshore transition joint bays near the Sutton Bridge landfall to the ROW01 onshore substation at Walpole, were fully installed and formed the onshore link between the offshore export cables and the National Grid connection at Walpole.