The PEZ Lot 3 — “Fairybank” connection is the planned high-capacity grid connection to link the Fairybank offshore wind project (Princess Elisabeth Zone Lot 3) to the Princess Elisabeth Energy Island (the Modular Offshore Grid II / MOG II) in the Belgian North Sea. The connection is intended to e...