Geoquip Marine Operations AG conducted an offshore geotechnical survey for Outer Dowsing Offshore Wind, using the vessel Geoquip Saentis to undertake geotechnical boreholes at locations within the proposed wind farm area. The survey campaign was scheduled between 1 July and 22 August 2024.