Smulders, as part of a joint venture with HSM Offshore Energy and Iv-Offshore & Energy, was awarded by 50Hertz the EPCIC contract for the Ostwind 3 offshore high-voltage substation and its jacket. The scope covered engineering, procurement, construction, installation, and commissioning of the offshore substation platform located northeast of the island of Rügen in the Baltic Sea, with a planned capacity of 300 MW.