XOCEAN completed a multi-phase geophysical survey along the approximately 420 km offshore export cable route for the proposed Ossian floating offshore wind farm. The survey used uncrewed survey vessels (USVs) over a 13-month period and collected data from shoreline waters to depths of over 100 m to support route identification for the offshore export cables and inputs to environmental assessment and engineering during the project’s development stage.