Positive
Project advancing - milestone achieved
Low Impact
Minor progress or informational
Concurrently with the floating LiDAR deployment in August 2022, Partrac installed metocean instruments, including three wave buoys and three subsea moorings, at the Ossian site to begin collecting data on waves, currents, tidal levels, turbidity, conductivity and temperature over an extended period.