Positive
Project advancing - milestone achieved
Low Impact
Minor progress or informational
A previous survey of the Ormonde Offshore Wind Farm site and export cable route was conducted in 2008, providing baseline data on bathymetry and seabed features that were later used together with the 2013 EGS post-construction survey to generate bathymetric difference plots along the export cable route and across the offshore infrastructure area linked to the Ormonde OFTO transmission assets.