Negative
Setback or risk materialised
Medium Impact
Significant progress or notable issue
Energinet reports that the Øresund 400 kV System 2 cable connection between Zealand and southern Sweden was damaged in 2019, an event that reduced the capacity of the interconnector and led to socio‑economic losses due to the constrained transmission capability.