Nysted (Rødsand I) export cable is the HVAC export connection serving the 165–166 MW Nysted (Rødsand I) offshore wind farm (commissioned 2003). The wind farm uses an offshore substation to collect generation and export power to shore at medium transmission voltage (132 kV). The export route from the offshore substation...
Press enter or space to select a node. You can then use the arrow keys to move the node around. Press delete to remove it and escape to cancel.
Press enter or space to select an edge. You can then press delete to remove it or escape to cancel.
Route
Denmark
Denmark
Landfall
N/A
—
Grid Connection
—
Radsted substation (Radsted)
Denmark
Landfall:N/A
Grid:—
Denmark
Landfall:—
Grid:Radsted substation (Radsted)
Cable Specifications
Nysted (Rødsand I) export cable
132 kV HVAC · 11 km
System:132 kV HVAC
Route length:11 km(11 subsea)
Burial depth:
No single project-specific nominal burial depth for the Nysted (Rødsand I) 132 kV export cables was found in the provided sources. An EMF survey / measurement report cited Nysted as...
Fibre optic:
No project‑specific fibre count or explicit telecom/leasing arrangements for the Nysted (Rødsand I) export cables were identified in the provided sources. However, industry practice for 132 kV export cables (and...