Cable depth and temperature monitoring for Norther’s inter-array and export cables using Marlinks’ DTS-based technology.
Marlinks secured a contract with Norther NV to provide distributed temperature sensing (DTS) cable monitoring for the wind farm’s subsea cable system, covering continuous monitoring of cable temperature and burial depth. The monitoring scope covered the inter-array cable network (and also the export cable per the source), with system installation starting in Q4 2020 and targeted for completion in early 2021.