N-Sea supported the North Irish Sea Array (NISA) offshore wind farm export cable corridor/site investigations by undertaking a geotechnical site investigation campaign in the NISA array area and cable corridor. The campaign scope included seabed borehole drilling, cone penetration testing (CPT) and vibrocores from survey vessels at locations within the proposed NISA development and export cable route area.