Erected the 30 Vestas V80-2.0 MW turbines at North Hoyle in February–March 2004 using the purpose-built turbine installation vessel Mayflower Resolution (designed by Knud E Hansen, supervised by Graig Shipping, built at Shanhaiguan Shipyard). Mayflower Energy was the vessel operator at the time of erection; following Mayflower Energy's March 2004 administration, MPI Offshore took over the vessel.