Next Geosolutions carried out cable protection survey work for Statnett that included inspections of the NorNed HVDC submarine power cable.
Next Geosolutions was awarded multimillion‑euro survey contracts associated with the North Sea Link project, including a cable protection survey for Statnett that covered inspections of the existing Skagerrak and NorNed power cable interconnectors. For NorNed, Next Geosolutions undertook offshore cable inspections using ROV and towed systems to track the cable, assess depth of burial and protection, and identify any exposure or potential hazards, thereby contributing to the operational integrity and maintenance planning of the NorNed HVDC link.