Inter-array cables (33 kV) for Nordsee One: ten strings overall length ~70 km; SIEM Offshore Contractors to supply and install inter-array cables; installed/terminated/trenched/tested ~70 km; EPIC/EPIC contract for IAG cable system.
SIEM Offshore Contractors supplied and installed the Nordsee One inter-array (33 kV) cable system, covering the laying, burial/trenching, termination, testing and commissioning of approximately 70 km of submarine inter-array cables connecting the 54 turbines to the offshore substation. The works were executed using specialist cable-laying/installation vessels (including Siem Aimery and support vessel Siem Moxie) and included associated cable-system accessories and protection elements as part of the EPIC/turnkey inter-array cable scope.