JDR to provide over 70 km of aluminium core inter-array cable for Nordsee One (33 kV), plus accessories and post-delivery offshore services; designed by JDR and manufactured at Hartlepool; two cable cross-sections 240 mm2 and 800 mm2.
JDR signed a contract with Siem Offshore Contractors GmbH to design and manufacture Nordsee One’s aluminium-core 33 kV inter-array cable package, supplying over 70 km of XLPE insulated inter-array cables (including two cable designs with 240 mm² and 800 mm² aluminium conductors). JDR also supplied cable accessories (e.g., pulling grips/hang-offs, cleats, termination connectors, fibre-optic splice boxes) and provided post-delivery offshore field services to support hang-off installation and cable routing, termination and testing.