TenneT was identified in the German offshore grid development plan (FEP) as the responsible transmission system operator for the NOR-11-2 offshore grid connection system serving areas N-11.2 and N-13.1. The scope comprised delivery of the offshore converter platform, the onshore converter station (Wilhelmshaven 2), and the associated ±525 kV HVDC cable sections (land, coastal waters, and EEZ) to connect the offshore wind farm areas to the onshore transmission grid.