Amprion GmbH was identified as the responsible transmission system operator with the offshore grid connection obligation (Anbindungsverpflichteter Übertragungsnetzbetreiber) for the NOR-6-3 offshore grid connection system that will connect the Nordlicht II offshore wind farm site (BSH area N-6.6) to the onshore transmission grid. The grid connection completion date was stated as 16 November 2028.