Inter-array (array) subsea cables for Nordlicht I; 66 kV network connecting turbines to the offshore substation; Jan De Nul installation scope.
Jan De Nul was contracted by Vattenfall and BASF to install the inter-array cables at the Nordlicht offshore wind farms. For Nordlicht I, the scope covered installation of the subsea inter-array cable network connecting the wind turbines and linking them to the offshore substation, using the cable installation vessel Connector.