JBO provided basic and detailed design for the Nordergründe substructures (monopile and transition piece). The design scope included permitting design, flange and grouted connection design, secondary steel element planning (e.g., boat landings, platforms, J-tubes), technical specifications, ice and collision analyses, weight control, and fatigue assessment of piles after piling, for a planning period stated as 2015–2016.