Høj Marine executed rock placement works at the Nordergründe offshore wind farm to mitigate erosion/scour around the installed monopile foundations. The work involved deploying the vessel Camilla Høj with hydraulic equipment and placing coarse rock material around existing monopiles while avoiding interference with infield cables; the rock material was sourced in Norway and loaded at sea.