TSOs submitted NOR-16-4 in Netzentwicklungsplan (NEP) 2037/2045 (2025) 2nd draft, published 13 March 2026. The plan identifies NOR-16-4 as a required offshore grid connection system (ONAS) to reach the 70 GW statutory target. Pending BNetzA confirmation under §12c EnWG.
Showing historic events only. Subscribe for the full timeline including projected milestones.
Upgrade to access detailed cable specifications, supply chain data, projected timeline, financial analysis, and more.
NOR-16-4 is a 2 GW HVDC offshore grid connection system operated by Amprion GmbH, connecting North Sea wind farms to the onshore grid at Kriftel via an approximately 848 km subsea cable route. Target commissioning: 2038. Part of the Rhein-Main-Link corridor. NEP scenario B 2037 / B 2045. NOR-16-4...