EPCI for inter-array and interconnector cables; 66 kV inter-array cables connecting WTGs to OSSs
DEME Offshore was awarded an EPCI contract for the Neart na Gaoithe offshore wind farm covering the inter-array (inter-turbine) cable system and the interconnector cable between the two offshore substations. The stated scope included engineering, procurement, construction, and offshore installation of the subsea cables for the 450 MW project.