On 2 June 2023, a plenary consultation meeting known as the "Fontaine" session was held under the authority of the Préfet de l’Aude to present the synthesis of initial studies and to confirm the boundaries of the study area for the Narbonnaise floating wind grid connection. The meeting brought together stakeholders to discuss and validate the offshore and onshore study area that will host the shared 225 kV connection for the 250 MW AO6 park and the future 500 MW AO9 Narbonnaise 2 extension.