N-9.5 is a planned offshore wind farm site at BSH FEP location N-9.5 in the German North Sea (cluster 9), nominal indicative capacity ~1,000 MW. The site is scheduled for the 2028 BNetzA auction round; no developer has yet been awarded. Grid connection is planned via BalWin5 (NOR-9-4, TenneT) ±52...
Site N-9.5 designated in the BSH Flächenentwicklungsplan 2025 amendment (30 January 2026) as a North Sea cluster-9 site paired with NOR-9-4 (BalWin5) for grid connection. 2028 auction year scheduled; commissioning targeted ~2033 Q3 per FEP Tabelle 7.