N-6.8 is a planned ~2 GW offshore wind farm sub-site in BSH area N-6 (German North Sea Zone 4), explicitly designated under the BSH FEP 2025 amendment Tabelle 14 (Annex VI, 30 January 2026) as the sub-site that the BorWin7 (NOR-6-4) ±525 kV HVDC system will connect. Grid connection is provided by...
Sub-site N-6.8 explicitly designated under the BSH Flächenentwicklungsplan 2025 amendment (30 January 2026, Tabelle 14 Annex VI) as the ~2 GW wind-farm sub-site that the BorWin7 (NOR-6-4) ±525 kV HVDC system will serve, with formal site → ONAS pairing under the regulator's binding plan and IBN 2034. Originally introduced in NEP 2037/2045 (2023) as NOR-21-1, the system was renumbered to NOR-6-4 in NEP 2025 to align with the target N-6 area. No developer awarded.
Showing historic events only. Subscribe for the full timeline including projected milestones.
Upgrade to access detailed cable specifications, supply chain data, projected timeline, financial analysis, and more.