N-13.2 is a planned offshore wind farm site at BSH FEP location N-13.2 in the German North Sea (cluster 13), nominal indicative capacity ~1,000 MW. The site is scheduled for the 2027 BNetzA auction round; no developer has yet been awarded. Grid connection is planned via LanWin5 (NOR-13-1, TenneT)...
Site N-13.2 designated in the BSH Flächenentwicklungsplan 2025 amendment (30 January 2026) as a North Sea cluster-13 site paired with NOR-13-1 (LanWin5) for grid connection. 2027 auction year scheduled; commissioning targeted with the LanWin5 system in 2032-2033.