N-13.1 is a planned offshore wind farm site at BSH FEP location N-13.1 in the German North Sea (cluster 13), nominal indicative capacity ~1,000 MW. The site is scheduled for the 2027 BNetzA auction round; no developer has yet been awarded. Grid connection is planned via LanWin4 (NOR-11-2, TenneT)...
Site N-13.1 designated in the BSH Flächenentwicklungsplan 2025 amendment (30 January 2026) as a North Sea cluster-13 site paired with NOR-11-2 (LanWin4) for grid connection. 2027 auction year scheduled; commissioning targeted with the LanWin4 system in 2031-2032.
Showing historic events only. Subscribe for the full timeline including projected milestones.
Upgrade to access detailed cable specifications, supply chain data, projected timeline, financial analysis, and more.