Positive
Project advancing - milestone achieved
Low Impact
Minor progress or informational
As part of the preliminary investigation of Area N-10, the hydrographic survey campaign covering the N-10 sites, including N-10.1, was completed, with the "Final Report Hydrographic Survey, N-10" dated 26 February 2025 made available by BSH, documenting bathymetric and seabed conditions relevant for future wind farm and cable design.