Chubb was one of the companies involved in Mutual Energy’s 2024 mid-life upgrade project on the Moyle Interconnector. The scope of the overall project included replacing the fire detection and control system and carrying out related works at the converter station sites, contributing to improved safety and reliability of the interconnector’s station infrastructure.