Global Energy Group (GEG) was contracted by Moray West Offshore Wind Farm to fabricate and supply two J-tube frames to be attached to the two offshore substation platform (OSP) foundations. The ~37 m long and ~11 m diameter frames support steel tubes that protect the cables entering the OSPs from the wind turbines and the export cable to shore. Fabrication was to be carried out at GEG’s quayside facilities at the Port of Nigg (Cromarty Firth).