ARC was contracted by DEME to provide a Works Manager and a Senior Field Engineer to support the inter-array and offshore substation interconnector cable installation package for the Moray East offshore wind farm. ARC’s scope included advising on cable installation methodology and procedures, supporting operational optimisation during cable lay and pull-in activities on the Living Stone, and assisting with mobilisation and interface management for cable-lay and support vessels.