Positive
Project advancing - milestone achieved
Medium Impact
Significant progress or notable issue
By the time the Preliminary Environmental Information Report was issued in early 2023, Mona Offshore Wind Limited had undertaken site selection and constraints analysis to identify and refine transmission route options for the Mona Project, covering both the offshore export cable corridor between the Mona Array Area and landfall and the onshore export cable corridor linking landfall to the proposed onshore substation and the Bodelwyddan National Grid substation. This process defined the Mona Offshore Cable Corridor, generally 1.5 km wide with specified separation distances between cables, and shortlisted landfall locations, onshore cable routes and onshore substation zones to be taken forward for further assessment and consultation.