On 31 May 2024, Elia Transmission Belgium (ETB) announced that it had completed repair works on the cable connecting the 309 MW Rentel offshore wind farm, which had previously suffered a fault in early January 2024.
1 Cost inflated in local currency then converted to euros (where applicable).