Inter-array cables installed by Tideway (DEME Group); overall inner array cable length reported ~83–84.6 km.
Tideway (DEME Group) installed the Merkur Offshore wind farm inter-array (inner array) cable system, covering cable lay and associated offshore works for the 33 kV turbine-to-substation array network.